link to current issue
news beat
Features link
Archives link
About Us
link

DEPARTMENTS
News Beat
Datebook
Contracts Awarded
Concept to Completion: Sheraton Waikiki Master Plan, Phase 2
News Makers
Low Bids
New Products


Bid Service Weekly

lists jobs up for bid, has a plans room, announces bidding awards

 




At Least Sports Fans Will Be Happy

Agency awards in January got the year off to a lackluster start with a value of $19,825,104 compared to last year’s stimulus-driven total of $92,877,732. That’s a big drop by anyone’s calculations but you can’t blame D.A.G.S., which more than doubled its awards to $9.7 million from $4.4 million last January. The Big Island also pumped in additional funds totaling $4.36 million com- pared to $1.88 million a year ago.

Biggest award went to Abhe & Svoboda. The $9.66 million for Aloha Stadium roof decking may not guarantee a win over Southern California come September but will ensure that the fans in Sections L to Q stay dry if it rains.

JANUARY 2009 (Awards are rounded up to the nearest dollar.)

Oahu

Abhe & Svoboda $9,663,310
Aloha Stadium- Replace Metal Roof Deck and Transformers (Sections LL to QQ, R and S, and L to Q)

International Road Dynamics 1,485,875
Enhanced Vehicle Classification Data Collection Goods and Services

Sea Engineering 1,374,794
Structural Repairs at Piers 9-11 (Phase 1) – Honolulu Harbor

Hawaiian Dredging 484,300
Embankment Repairs at Kalaeloa Barbers Point Harbor (Phase 2)

Integrated Construction 244,450
Kalanianaole Highway Safety Improvements – Blow Hole to Lunalilo Home Road

West Coast Roofing 131,956
Kalihi Waena Elementary School – Reroofing of Buildings C and D

Perfecto Engineering 71,100
Pearl City Highlands Elementary School Covered Walkway

Beachside Roofing 39,327
Repair Roof at Harbors Division, Administration Building – Honolulu Harbor

SK Electric 19,000
Department of Agriculture Oahu Facilities – Electrical Safety Improvements

Maui

Maui Paving 132,460
Pavement Repairs at Pier 1 Container Yard – Kahului Harbor

Maui Master Builders 25,163
Repair Fence – Hana Harbor

Hawaii

Isemoto Contracting 4,269,280
Mamalahoa Highway Earthquake Repairs, M.P. 4.4 (FHWA-03) and M.P. 8.9 (FHWA-09) and Palani Road Pedestrian Overpass Repairs, (FHWA-02), Kiholo Bay Earthquake, North Kona

William Loeffler Construction 93,855
Kapiolani Street Sidewalk Improvements, Phase 1 – (Ponahawai to Alenaio Stream Bridge), South Hilo

Kauai

Earthworks Pacific 1,752,457
Kuhio Highway – Retaining Walls at Lumahai and Wainiha, Hanalei

Integrated Construction 37,777
Repair Water Lateral No. 4 at Pier 3 – Nawiliwili Harbor